Prime Ministerial Private Office files
Malaysia: Hurd PS letter to No.10 ("ATP Malaysia: Pergau Hydro-Electric Project") ["As Balfour Beatty now accept, their failure to provide us with accurate cost estimates... has placed us in a very difficult position"] [declassified Dec 2016]
Document type: | Declassified documents |
---|---|
Source: | PREM19/2770 f127 |
Editorial comments: | Read other documents selected from this file. The full file from which this item is taken can be seen here - PREM19-2770. |
Importance ranking: | Major |
Word count: | 3pp |
Themes: | Industry, Public spending & borrowing, Foreign policy (Asia), Foreign policy (development, aid, etc), European Union (general) |
View this document (PDF, 199.31 KB)